
Specification Checklist
SC200/two hundred CZPT CZPT Two-motor Travel and With Velocity 33m/min
| SC200/200 Two-motor Equipment Reducer Variety CZPT Functionality Parameter Checklist | ||||
| No. | Product | Device | Parameter | Notice |
| 1 | Reted Load | kg | two x 2000 | CZPT cage |
| two | Install/disassemble Reted load | kg | two x a thousand | CZPT cage |
| 3 | Lifting Speed | m/min | 33 | Reducer Ratio 1:sixteen |
| 4 | Max. Top | m | 200 | |
| 5 | Cage Dimension(LXW) | m x m | 3×1.5/3.2×1.five | |
| 6 | Distance Amongst Basis And Cage Bottom | m | .forty six | |
| 7 | Length amongst Anchor | m | ≤9 | |
| eight | Totally free Stop Peak | m | ≤9 | |
| nine | Electricity Supply | V | 380V±5% | |
| 10 | Motor Power | kw | 2x2x13 | JC=twenty five% |
| eleven | Rated Existing | A | 2x2x28 | |
| 12 | Safety System Design | SAJ40-1.2A | ||
ZheJiang CZPT CZPT CZPT Co., Ltd was started in Dec. 2000, specialized in manufacturing tower cranes and building elevators, we are pioneer of Chinese tower crane business.
At current our items go over nine collection and more than twenty designs, such as QTZ50, QTZ63, QTZ80, QTZ125, QTZ160, QTZ250, QTZ315, QTZ500, SC200/two hundred, the technical indicators have arrived at the leading amount at house and overseas.
Substantial good quality
Uncooked content is the basis of item and the first hurdle to guarantee quality. CZPT tower crane bulk buy steel straight from big metal factories like Baosteel and Wisco, boost the safety of product.
1st class components
Very first-course product composed by first-class parts, CZPT always insisted to use the 1st class components, as Fangyuan help, Schneider electric powered aspect and many others.
Innovative processing gear
We have the most advanced processing tools, such as the large laser reducing machine,CNC plasma cutters, CNC drilling equipment, lathes, milling devices, sawing equipment and other people.
Robot automated welding system and post-weld overall processing equipment
We are the first business to undertake mast sections and major chord robotic welding technique in the very same industry in China.
This method is trustworthy in the performance, with substantial perform performance and large automated degree.
The welding quality far more reliable and resilient.
The primary limbs of the mast section, the turntable and other parts are all processed and drilled soon after welding to boost the accuracy.
Automatic impeller blasting and spraying assembly line
The huge structure components are dealt with impeller blasting just before spraying.
That remove metal area oxides and welding spatters efficiently, eradicates the inside pressure making in welding method, will increase the parts’ anti-determine energy and steel area hardness, increases portray adhesion and prolong the service existence of the solution maximizes effectiveness and saves vitality
Rigid good quality assessment
CZPT have the strict quality examination, raw content take a look at, test of welding, examining welding good quality of look, assembly and adjustment of jib, tower head and pivot in factory.
Security protection
Fully safety protection devices enhances the safety, bodyweight limiters, undertake the sophisticated pull-ring composition from abroad, instant adopt bow-board mechanical sort which can be used in extreme wild setting.
We have professional packing individual to put the tower crane in the container or on to the truck.
F A Q
Q1: How a lot of nations have you exported your merchandise to?
A1:Our tower cranes had exported to more than twenty nations around the world, such as Korea, Vietnam, Philippines, Indonesia, India, Sri Lanka, Cambodia, Russia, Kazakhstan, Brazil, Algeria, Ukraine, Turkey etc.
Q2: How to affirm a ideal building hoist design?
A2: My expensive buddies, you should notify us the below fundamental parameters to affirm hoist design:
a. Developing peak.
b. Max load potential .
c. Other Unique specifications
Q3: Can you install the hoist for us
A3: Yes, we can send 1 engineer to your region for installing, but you should bear the value.
This autumn: Warranty time?
A4: twelve thirty day period from the delivery working day (apart from the donning parts).
Any other concerns Message now ! hope can cooperate with you! and welcome to visit us!
