Construction Elevator Flexible Coupling with Rubber for Passenger Hoist 

CZPT CZPT Versatile coupling with rubber for passenger hoist

Merchandise Application

Gearbox motor rubber coupling is utilizing for passenger hoist gearbox motor spare components.

Gearbox Motor Rubber Coupling (Passenger CZPT Equipment Motor areas)

Software

CZPT Passenger CZPT

Component identify

Gearbox Motor Rubber Coupling

Brand name

Alimak/GJJ/Baoda/Zoomlion etc.

Deal

Carton/Wooden box

Tailored design lift design

SC100/SC200

 Size

Round Claw  Quantity

OD(outer diameter)(mm)    ID( interior diameter)(mm) Thickness(mm)
four forty eight 19 twelve
six 65 28 18
six 80 35 eighteen
six 100 42 20
six 120 fifty five twenty five
6 a hundred and forty 65 thirty
eight one hundred sixty five ninety 30
8 195 100 35
ten 225 115 35
10 255 one hundred forty fifty
ten 255 one hundred fifty 44
ten 295 a hundred and sixty fifty
ten 295 one hundred seventy 50
ten 295 one hundred sixty five fifty
ten 295 one hundred sixty five 50
12 355 215 55

 

Square  claw  Quantity

  OD(outer diameter)(mm)   OD(outer diameter)(mm)   Thickness(mm)
4 seventy five 35 15
six 80 forty 15
six 85 41 18
6 90 forty two twenty
6 ninety five forty five 20
six 100 49 20
eight a hundred and five fifty 22
eight one hundred ten fifty five 22
ten 120 59 twenty five
ten 125 sixty twenty five
ten a hundred thirty 65 25
10 135 63 25
ten one hundred forty seventy two 25
10 145 73 28
ten a hundred and fifty 75 28
12 a hundred and fifty five eighty 28

Driving device with 2-motors / 3-motors
motor: 11kw, 14.5kw,18kw
motor spare components: braking program brake sheet, motor adjustor, electromagnet,motor enthusiast.
safety device: 30KN,40KN,50KN,60KN
gearbox: 16:1,fourteen:one,twelve:one hundred ten:one
coupling with rubber
master rollers for seventy six tube and 89 tube
equipment rack M8 40x60x1508mm
gear pinion: M8,15teeth
limit swap
gate rollers
counter rollers
transformer
Overload defend program
cable: 3×16+2×6, 3×16+2×10
building hoist Rubber
All varieties of hoist spare parts
Driving unit with 2-motors / three-motors
motor: 11kw, 14.5kw,18kw
motor spare areas: braking system brake sheet, motor adjustor, electromagnet,motor enthusiast.
protection unit: 30KN,40KN,50KN,60KN
gearbox: 16:1,14:one,12:110:one

Packing and supply:

CZPTer pay a visit to:

Enterprise qualification and certification:

 FAQ:
one. Q : Are you producer or buying and selling organization ? 
A : CLSJ company is integrating of manufacturer and investing . We generate electric powered chain hoist and electric winches. In the meantime , our organization is a specialist supplier of various lifting and substance handling tools , solution consist of : wire rope hoist , hand chain hoist , lever hoist , hoist trolleys , hand winches , tirfor winches , lifting magets , lifting clamps , pulley block , crane scales , crane and crane parts , Aluminum and fiberglass ladders etc . 
2. Q : How about your product high quality ? 
A : ” Top quality is our company’s lifestyle , Safety always will come initial .”  It’s our organization basic principle and our promise to clients . Based on this , we focuse on every particulars about the products , from the raw material to the procession till the complete products finishing , we have stricty top quality control technique . At least five methods inspection for the duration of the whole procession . 
3. Q: How about the warranty ?
A : Normally for the electrical wearing elements , 1 several years warranty . Others elements 3 several years for the winch.
four. Q : Any soon after-revenue support ?
A: Confident , our qualified staff including the sales and technicians will supply you with strong right after-product sales services at any time .
5. Q: Can we have our Possess manufacturer on the items ?
A : Positive , OEM is absolutely suitable .
six. Q : What is the MOQ ?
A : Sample order is acceptable , MOQ is one established .
7. Q : How about the lead time ?
A : Direct time relies upon on the purchase amount , If much less than 10 models ,it will about 10 times . If a single container , it will just take about 20 days .  
eight.  Q : Which sea port is the nearest ?
A :  ZheJiang Port is the closest for us , But we can ship the products as your ask for .

  1.  Q : How about the payment time period ?

Welcome to deliver us an inquiry, we will provide you with much more accurate solution details.

 

Construction Elevator Flexible Coupling with Rubber for Passenger Hoist