
Warmth Treatment Xihu (West Lake) Dis. Roller VL 3 ton Chain CZPT Alloy Metal G80 Load Chain Lever CZPT Rachet Puller CZPT
1.Compact,Light however Sturdy
2.CZPT-pawl brake program made for safety and reliabilty
three.Heat handled steel plates,gears and shafte for increased power.solid upper,reduced hooks with cast steel basic safety latched,high tensile alloy metal chain.
four.Free-wheeling system for swift chain adjustment.
5.Weston type automatic load brake with double pawl load reduction.
six.360 desgree rotating handle of east of use in confined place.
seven.Ldeling mechnism to permit quickly adjustment of load chain.
8.Basic safety element:4 to 1.
nine.Fatigue tested at 1.five moments of functioning load restrict to 2000 cycles
ten.CZPT:EN13157
Specifications
| Model | VL-.seventy five | VL-one | VL-one.five | VL-3. | VL-6 | VL-nine | ||||||||
| Ability(t) | .75 | one | 1.five | 3 | six | 9 | ||||||||
| CZPT lift(m) | 1.5 | 1.5 | one.5 | 1.five | 1.five | 1.five | ||||||||
| Working check load(t) | 9.2 | 12.three | eighteen.4 | 36.8 | seventy three.5 | 110.3 | ||||||||
| Work necessary to elevate max.load(N) | 148 | 197 | 216 | 336 | 345 | 357 | ||||||||
| No.of coluns of load chain | 1 | one | one | 1 | 2 | 3 | ||||||||
| Load chain dia. (mm) | 6.three | 6.three | seven.1 | nine | nine | 9 | ||||||||
| Web Bodyweight (kg) | six.six | six.6 | eleven.sixty five | 21.one | 23.7 | 54 | ||||||||
| Dimensions(mm) | A 155 | one hundred fifty five | 170 | 198 | 198 | 198 | ||||||||
| B 128 | 128 | 147 | 182 | 230 | 350 | |||||||||
| C 310 | 310 | 350 | 470 | 590 | 740 | |||||||||
| D 240 | 240 | 365 | 365 | 365 | 365 | |||||||||
| E 28 | 32 | 36 | forty seven | 49 | sixty five | |||||||||
Advantage of Most Aggressive VL Series Lifting Crane
one) Ability from .25T to 9T, Minimum headroom needed and really flexible in operation
2) Computerized double-pawl braking method
3) Chain guides provide sleek chain operation
4) Roller bearing supported load sheaves for keeping away from abrasion
5) G80 Chain are made of unique alloy metal that is solely
six) Fall solid kooks to make sure superior quallity and protection
7) The lever hoist sling hand static take a look at is 4 times of potential, and managing check is 1.5 times of capacit one particular by one
eight) The lever hoist sling hand is of higher efficiency, fast lifting and mild hand pull.
9). It is for pulling in each and every limited narrow places,in the upper air higher above the floor at any angles.
Payment
| Payment term | L/C | l/c volume above forty.000 usd,we can acknowledge L/C at sight | |
| T/T |
EXW | 30% T/T in advance,paid out the stability prior to shipment |
|
| FOB | |||
| CIF | 30% T/T in progress,paid the stability from copy of B/L |
||
| cfr(c&f) | |||
| paypal | amount lower than 4000usd |
||
| west | |||
| Supply time | 15~35days soon after acquiring payment for a single container |
| We welcome use trade assurance,you`ll appreciate: 100% item high quality defense a hundred% on-time cargo security one hundred% payment protection for your coated volume |
Remember to Make contact with ME:
Make contact with: Overlook Angela dong
HangCZPT CZPT CZPTal Co.,Ltd
