
Brief Introduction:
This medium measurement blended harvester with 1450mm harvest width. It has substantial efficiency which can attain to .27 ha/h. This equipment matched with rubber crawler which have a more time provider daily life than tyre crawler. And it can shield the field soil extremely nicely than wheel variety. This harvester matched with vibrating monitor which can harvest the grain more clear. And it also apply to crops which received flattened right after the storm.
Principal Features:
one. Straightforward framework, sturdy capability to rake, sturdy, straightforward to run and servicing.
2. Specially ideal for the modest field, land ,hills .
three. Substantial performance and low oil intake.
4. Very good good quality and reasonable value.
Principal CZPT Parameters:
|
Dimension(L*W*H) |
3450x1650x2050 |
|
Total weight |
1200kgs |
|
Feeding volume |
one.6kg/s |
|
Supporting power |
ZS1115 diesel engine |
|
Engine power |
28HP |
|
Rotated speed |
2200r/min |
|
Crawler size |
seventy two*forty eight*280mm |
|
Productivity |
.one-.27ha/h |
|
Harvesting width |
1450mm |
|
Application |
Hilly and mountains, dryland, water field. |
|
Oil consumption rate |
.02-.05kg/ha |
|
Impurities rate |
≤ 2% |
|
Loss of percentage |
≤3% |
|
|
Can work less than 200mm |
|
Packaging |
3 set for 40′ FCL |
Merchandise Present:
CZPTer Pay a visit to:
Manufacturing facility Images:
Pre-Revenue Provider:
one. Inquiry and consulting assistance
two. Sample testing help
three. See our Manufacturing unit
Right after-Income Provider:
one.pay the double air tickets, accommodation and food. Our technicists can help you in nearby location
2.According to the requirement of the buyer, our company sends engineers for installation and commissioning in buyer’s site including the training of skills of buyer’s workers on operation, maintenance, etc.
three.Offer the remedies for distinct farming atmosphere.
4. For the damage caused by the users, our company provides the parts and accessories with cost price.
5. Our factory supplies the wearing parts with the cost price to clients.
Deal&Delivery:
Items will be finished in fifteen-20 doing work days following payment. It relies upon on your purchase amount. And the shipping time to the port is about one-two times
